Atzendorf, Germany – 1.4 MW
697kWp + 750kWp solar project in Germany
Work done:
- Installation of the electrical modules
- Installation of the DC cabling
- Installation of the AC/DC inverters
- Logistics in regard to electrical components (storage, acceptance, insurance)
AC Installation:
- Connection of AC low voltage wiring
- Connection of low voltage side TS
- Connection of AC collection boxes
- Connection of the cabling for the safety system
- Logistics in regard to electrical components (storage, acceptance, insurance)
697kWp + 750kWp solar project in Germany
Work done:
- Installation of the electrical modules
- Installation of the DC cabling
- Installation of the AC/DC inverters
- Logistics in regard to electrical components (storage, acceptance, insurance)
AC Installation:
- Connection of AC low voltage wiring
- Connection of low voltage side TS
- Connection of AC collection boxes
- Connection of the cabling for the safety system
- Logistics in regard to electrical components (storage, acceptance, insurance)