Solar PV project in Bristol, United Kingdom
Mechanical works:
- Off-loading, distribution, ramming, assembling, and testing of the mounting structure
- Ramming of the piles
- PV and Inverter Structure Mounting
- PV Module Installation
Mechanical works:
Mechanical works:
Mechanical works:
Mechanical works:
– Ramming of the piles
– Structure Mounting System
– Mounting of the PV panels
Electrical works:
– Laying of the DC, AC (LV, MV) data cables
– Inverter installation
– MV stations installation and cabling
– Installation of Earthing systems, Weather station, CCTV, and SCADA systems
50 MW solar project in Spain
Mechanical and Electrical installation of PV Modules:
697kWp + 750kWp solar project in Germany
Work done:
AC Installation:
The solar farm is situated on land near Fishbeck, Germany.
Work done:
AC Installation:
This 50 MW solar park is situated on a disused airfield near Fakenham in Norfolk and is one of the largest in the UK, generating enough renewable electricity to power more than 11,000 average homes
Work done:
– Site management
– Security 24 h
– Temporary storage area
– Reception and Unloading of the materials
Civil works:
– Ground cleaning and preparation of the working area
– Road Paths
– Internal and Access Road
– Execution of buildings foundation
– Execution of Customer Switching Room, Control and CCTV Building, and Meteorological Station Foundations
– Trenches and conduits (supply and installation)
– Fencing (supply and installation)
– Demolitions
Mechanical works:
– Topographical works
– Ramming of the piles
– Structure Mounting System
– Mounting of the PV panels
Electrical works:
– Installation of AC cabling between inverters and transformers
– Installation of DC cabling between inverters and string combiner boxes
– Installation of DC cabling between string combiner boxes and panels
– Connection PV modules
– Assembly of string combiner boxes
– Connection and installation of the inverters, MV transformers
– Grounding connection
– Installation of auxiliary supply between the distribution board and inverter.
– Fitting of fuses (left forward) in each string combiner box.
– Installation of data cabling between the logger, inverters, and string combiner boxes.
– Installation of 1 off-earth rod and earth lead to each string combiner box.
– Connection of each substation earth mat linking the inverters and transformers together.
– Carry out final landing/termination of all installed cabling.
– Testing and commissioning
– As-built documents
The solar farm is situated on land at Primrose Hill Farm in Lincolnshire. The solar farm will provide the local electricity needs of almost 1,100 average UK households and will save in the region of 2700 tons of carbon dioxide per year.
Works done:
The solar farm is located at Baker’s Farm. It has the capacity to generate up to 12 MW of clean energy, enough to power around 3,686 average UK households. It would save around 7200 tons of CO2 emissions per year.
Civil works:
– Topographical works
– Temporary storage area
– Delivery of materials, supplies
– Access road
– Inverter foundations
– Trenches and conduits
– Road paths
– Cleaning
Electrical works:
– Installation of DC cabling between inverters and string combiner boxes
– Installation of DC cabling between string combiner boxes and panels
– Installation of AC cabling between inverters and transformers
– Inverters connections
– Testing and commissioning
– As-built layouts
– Delivery system