GAARZ, Germany – 4.7 MW

Project Info

  • Construction Date

    August - October 2020

  • Category

    Civil Engineering

4.7 MW solar project in Germany

Work done:

  • Distribution of used materials (modules, etc.)
  • Waste management in the area
  • Installation of modules
  • DC string reconnection between rows in black pipes located in sand inside of trench,
  • Reconnecting of modules
  • DC cable fixation
  • String measurement and labeling and preparation of string measurement protocol
  • Connection to Gak boxes
  • Earthing of Gak boxes
  • Earthing of tables