Fishbeck, Germany – 7.2 MW

Project Info

  • Construction Date

    July - September 2020

  • Category

    Civil Engineering, Solar EPC

7,2 MW solar project


The solar farm is situated on land near Fishbeck, Germany.

Work done:

  • Fence installation
  • Preparation for the installation of the electrical modules
  • Installation of the electrical modules
  • Installation of the DC cabling
  • Installation of the DC solar connectors
  • Installation of the DC/AC inverters
  • Logistics with regard to electrical components (storage, acceptance, insurance)

AC Installation:

  • Installation of AC low-voltage wiring
  • Installation and connection of low voltage side TS and monitoring container
  • Installation of AC collection boxes
  • Installation of the cabling for the safety system
  • Installation and connection of mid-voltage side between TS and electrical site entry point
  • Logistics with regard to electrical components (storage, acceptance, insurance)